Project Statistics
Location: Lighthouse Point, Fla.
Type: Private Residence—Custom Home
Size: 4,800 sq. ft. (floor) conditioned
ICF Use: 5,400 sq. ft. (all exterior walls) plus ICF floor decking
Cost: Undisclosed
Total Construction: 320 days
ICF Installation time: 120 days
Construction Team
Owner/General Contractor: Wayne Teague
ICF Installer/Form Distributor: Safe Harbor Design/Build, LLC
Architect: DesignOdyssey
Engineer: Safe Harbor Design/Build, LLC
ICF System: Quad-Lock / Floors by Quad-Deck
Fast Facts
- Multiple radius and tall walls
- Sloped concrete roofs with ICF forms
- Used 183 yards of concrete
- Three separate solar panel systems heat water, power home, and sell excess power to electric company
- Owner reports $18,000 annual savings on homeowners insurance
|