2022 Education
2nd Runner-Up

Project Statistics 


Location: Papillion, Nebraska
Type: Education
Size: 55,000 sq. ft.
ICF Use: 29,559 sq. ft. 
Cost: $13,000,000
Total Construction: 14 months
ICF Installation Time: 8 weeks with 6-man crew

Construction Team 


Owner/Developer: Papillion LaVista Public Schools
General Contractor: Prairie Construction
ICF Installer: HVB ICF LLC
Form Distributor: Carroll Construction Supply
Architect: BCDM Architects
ICF System: Fox Blocks

Fast Facts 


  • Built with high-performance ICF wall assembly for maximum energy efficiency 
  • Winter construction with no shelters and heating costs to construct all ICF walls
  • Geothermal heat applied to interior slab minimizing heating costs 
  • TieKey used for attaching masonry veneer directly to concrete core
  • Saved three months compared to identical nearby school design built traditionally

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Like what you read?

Yearly Subscriptions Starting @ $30