2022 Light Commercial
2nd Runner-Up
Project Statistics
Location: Rohnert Park, California
Type: Car wash
Size: 6,389 sq. ft.
ICF Use: 19,827 sq. ft.
Cost: $1 million
Total Construction: 52 weeks
ICF Installation Time: 120 days
Construction Team
Owner/Developer: Future Xpress Car Wash
General Contractor: Crawford Construction / Tunnel Vision
ICF Installer: Crawford Construction
Form Distributor: California ICF
Architect: Thomas Reddy
Engineer: David Gowers
ICF System: IntegraSpec and InsulDeck
Fast Facts
- State of the art technology
- Recycled water and heat recovery for drying
- Soundproof walls, zero noise pollution
- Energy efficient and fireproof
- Passive geothermal shell made of 100% ICF