2022 MultiFamily
2nd Runner-Up
Project Statistics
Location: Calgary, Alberta, Canada
Type: Multifamily affordable housing
Size: 110,000 sq. ft.
ICF Use: 50,000 sq. ft.
Cost: $37,000,000
Total Construction: 64 weeks
ICF Installation Time: 5 days per floor, 18 floors
Construction Team
Owner/Developer: Kanas Corp.
General Contractor: Kanas Corp.
ICF Installer: Kanas Corp.
Architects: Casola Koppe Architects
Engineer: Eco Engineering
ICF System: SuperForm
Fast Facts
- 18-story highrise
- 110,000 sq. ft. with 135 residential units
- Co-generation and photovoltaic solar arrays
- Built to green platinum standards
- Uses 1/5th the energy of a traditional highrise
- Multilevel parkade