2023 MultiFamily
Winner

Project Statistics 


Location: Louisville, Kentucky 

Type: Collegiate residence hall

Size: 130,000 sq. ft.

ICF Use: 65,552 sq. ft.

Cost: $38,500,000

Total Construction: 75 weeks

ICF Installation Time: 90 days

Construction Team


Owner: University of Louisville

General Contractor: Messer Construction

ICF Installer: Olympic Construction

Structural Engineer: Brown + Kubican

Form Distributor: Nudura

Architect: JRA Architects & CSO

ICF System: Nudura

Fast Facts


  • 452-bed dorm with multiple gathering areas
  • Located in the heart of campus; adjacent to the Student Activities Center
  • Houses the University’s Center for Engaged Learning
  • Student input was engaged and implemented during the design phase
  • ICF walls, precast floors, and integrated openings accelerated construction

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Like what you read?

Yearly Subscriptions Starting @ $30