2024 MultiFamily
1st Runner Up

Project Statistics


Location: Frankfort, Kentucky
Type: Student housing
Size: 163,400 sq. ft.
ICF Use: 78,340 sq. ft.
Cost: $37.6 million
Total Construction: 106 weeks
ICF Installation Time: 220 days

Construction Team


Owner/Developer: CRM Companies
General Contractor: D.W. Wilburn Inc.
ICF Installer: Olympic Construction
Form Distributor: Martin Clark
Architect: EOP Architects
Structural Engineer: Brown + Kubican, PSC
ICF System: Nudura

Fast Facts


  • KSU had major student housing needs
  • ICF accelerated design/construction schedule
  • Twice the size of next largest dorm
  • Designed from scratch in 10 weeks
  • Funded through a Public-Private-Partnership (P3)
  • KSU is Kentucky’s only Historically Black College

1 Comment

  1. Wanda D Hall

    As a 1976 KSU graduate alumni this is AWESOME news! Very much needed; Congrats on a great job! WELL DONE and thanks for sharing this news and video. 👏🏽🐎

    Reply

Submit a Comment

Your email address will not be published. Required fields are marked *

Like what you read?

Yearly Subscriptions Starting @ $30