Project Statistics


Location: Santa Rosa, California
Type: Residence
Size: 3,717 sq. ft.
ICF Use: 23,548 sq. ft.
Cost: $3 million
Total Construction: 168 weeks
ICF Installation Time: 520 days

Construction Team


Owner/Developer: Bala and Lila Iyer
General Contractor: MacKillop Construction
ICF Installer: MacKillop Construction
Form Distributor: California ICF
Architect: Bala and Lila Iyer, Nicholas Nikiforuk
Structural Engineers: Zenith Engineering
ICF System: IntegraSpec

Fast Facts


  • ICF footings
  • ICF concrete multi-dormer roof
  • ICF cantilever overhangs
  • ICF cistern for water harvesting
  • ICF elevator shaft
  • ICF concrete floors and cantilever decks
  • ICF retaining walls and fencing