Project Statistics
Location: Oklahoma City, Oklahoma
Type: Retail, showroom
Size: 4,615 sq. ft.
ICF Use: 5,040 sq. ft.
Cost: $1.2 million
Total Construction: 24 weeks
ICF Installation Time: 21 days
Construction Team
Owner/Developer: AC Owen Construction
General Contractor: AC Owen Construction
ICF Installer: KBA Constructors
Form Distributor: Dolese Bros. Co.
Other Team Members: BuildBlock consultant Russ Nicely
ICF System: BuildBlock
Fast Facts
-
Hardwall section behind the brick exterior
-
3 different exterior finishes: brick, metal siding, EIFS
-
Super Floor suspended concrete system roof
-
Installer’s first time building with ICFs and Super Floor