2025 Specialty Application
Winner
Project Statistics
Location: Comox, British Columbia
Type: Caregiver addition
Size: 970 sq ft.
ICF Use: 6,290 sq. ft.
Cost: $400,000
Total Construction: 104 weeks
ICF Installation Time: 122 days
Construction Team
Owner/Developer: Ken McDonald
General Contractor: Ken McDonald
ICF Installer: Ken McDonald
Form Distributor: Cedar Grove Building Products
Architect: Jennifer Charles Design
ICF System: Quad-Lock, Quad-Deck
Fast Facts
- Integrated into current home on 22-foot hill
- Many acute- and obtuse-angled corners
- Minimal site footprint, and is Net Zero
- Meets BC Building CODE Step 5 standards, seismic standards
- Custom Quad-Deck ICF with integrated in-floor radiant tubing
- Multigenerational design with wheelchair access, elevator
- 1,400 sq.ft. rooftop deck