2024 MultiFamily Low-Rise
2nd Runner Up

Project Statistics


Location: Esquimalt, British Columbia, Canada
Type: Townhomes
Size: 4,800 sq. ft.
ICF Use: 11,990 sq. ft.
Cost: $2.4 million CAD
Total Construction: 88 weeks
ICF Installation Time: 180 days

Construction Team


Owner/Developer: Xquimalt Developments Ltd.
General Contractor: Xquimalt Developments Ltd.
ICF Installer: Xquimalt Developments Ltd.
Form Distributor: Island ICF Foundation Supplies
Architect: XV Architecture Ltd.
Other Team Member: Antony Vermeulen
ICF System: Nudura

Fast Facts


  • First project for developer/builder
  • 6,200 sq. ft. of area built on 5,200 sq. ft. lot
  • All exterior walls on all three levels are ICF
  • ICF floor decks on all floors
  • British Columbia Step Code 3–compliant
  • Extensive overhangs (over 5’) and roof decks
  • Many corner conditions and cantilevers
  • Basements maximize living space under garage