Project Statistics
Location: Beavercreek, Ohio
Type: Hotel
Size: 90,000 sq. ft.
ICF Use: 66,728 sq. ft.
Cost: $20.3 million
Total Construction: 83 weeks
ICF Installation Time: 85 days
Construction Team
Owner/Developer: Scarlet & Gray Hospitality LLC
General Contractor: HiFive Development Services
ICF Installer: HVN Inc.
Form Distributor: Fox Blocks by Airlite Plastics
Architect: HiFive Design Group
ICF System: Fox Blocks by Airlite Plastics
Fast Facts
-
Four-story hotel completed two months ahead of schedule; 3 months saved
-
ICFs enabled winter construction
-
Projected annual tax savings exceed $200,000
-
High-efficiency PTAC units, LED lighting, and ERV make-up air systems
-
Energy modeling shows 35% energy reduction over ASHRAE 2010 standards
-
Actual performance delivers 20% utility cost reduction; savings of ~$36,000/year