2026 MultiFamily Low-Rise
Winner

Project Statistics


Location: Beavercreek, Ohio
Type: Hotel
Size: 90,000 sq. ft.
ICF Use: 66,728 sq. ft.
Cost: $20.3 million
Total Construction: 83 weeks
ICF Installation Time: 85 days

Construction Team


Owner/Developer: Scarlet & Gray Hospitality LLC
General Contractor: HiFive Development Services
ICF Installer: HVN Inc.
Form Distributor: Fox Blocks by Airlite Plastics
Architect: HiFive Design Group
ICF System: Fox Blocks by Airlite Plastics

Fast Facts


  • Four-story hotel completed two months ahead of schedule; 3 months saved

  • ICFs enabled winter construction

  • Projected annual tax savings exceed $200,000

  • High-efficiency PTAC units, LED lighting, and ERV make-up air systems

  • Energy modeling shows 35% energy reduction over ASHRAE 2010 standards

  • Actual performance delivers 20% utility cost reduction; savings of ~$36,000/year

Fairfield Inn & Suites – TownePlace Suites by Marriott

0 Comments

Submit a Comment

Your email address will not be published. Required fields are marked *

Like what you read?

Yearly Subscriptions Starting @ $30