Project Profiles
Small Residential
Above The Bar
2024 Small Residential 1st Runner Up& People's Choice Project Statistics Location: Salcombe, Devon, EnglandType: ResidenceSize: 2,066 sq. ft. ICF Use: 3,907 sq. ft. Cost: £940,800Total Construction: 52 weeksICF Installation Time: 6 weeksConstruction Team...
Shilakis Residence
2024 Small Residential2nd Runner Up Project Statistics Location: Tellico Village, Tennessee Type: ResidenceSize: 2,720 sq. ft. ICF Use: 5,115 sq. ft. Cost: $850,000Total Construction: 42 weeksICF Installation Time: 10 days Construction Team Owner/Developer: The...
King’s Bay Point
2024 Small ResidentialWinner The King’s Bay Point project is a small home with a big impact. At just under 3,000 square feet, the home was built with 100% ICF exterior walls in order to offer protection against any storms that might hit the Crystal River, Florida,...
Palos Residence
2023 Small Residential2nd Runner-Up This million-dollar home is 2,521 square feet, with a 606 square foot garage built using Fox Blocks forms by Airlite Plastics Co. The project used 660 square feet of interior ICF walls for a total of 4,795 square feet. Mike Kennaw,...
Zarillo Residence
2023 Small Residential1st Runner-Up Project Statistics Location: Watertown, ConnecticutType: ResidenceSize: 2,508 sq. ft.eICF Use: 9,623 sq. ft.Cost: $700,000Total Construction: 100 weeksICF Installation Time: 28 days Construction Team Owner: Zarillo Building...
Sunshine Green Home
2023 Small ResidentialWinner(People's Choice Winner) The Sunshine Green Home in Hurricane, Utah, may be small but it is packed with a lot of amenities and features. It boasts a 1,938-square-foot floor plan with three bedrooms, three bathrooms, three garages, and...
Burton House
2022 Small Residential1st Runner-Up(People’s Choice Winner) The Burton House in Lakefield, Ontario, Canada, maximized an addition to the existing historic structure by designing specifically for 16-inch Amvic blocks. The home expansion, completed in April 2020, used...
White Residence
2022 Small ResidentialWinner The two homeowners in Warwick, Rhode Island, William White and Jane Levesque, were also the builders on this project. This couple designed, drew, and constructed the home over nights, holidays, weekends, and vacations, including all...
The Sanctuary
2022 Small Residential2nd Runner-Up Project Statistics Location: Canton, OhioType: ResidenceSize: 2,447 sq. ft. ICF Use: 4,921 sq. ft. Cost: $425,000Total Construction: 32 WeeksICF Installation Time: 10 DaysConstruction Team Owner/Developer: Charis HomesGeneral...
Large Residential
Carmi Home Project
2024 Large Residential Winner& People's Choice Winner The Carmi Home Project in Penticton, British Columbia, Canada, was the Large Residential Winner and the Large Residential People’s Choice Winner in the 2024 ICF Builder Awards. The 5,422-square-foot project...
LaLiberte Iconic
2024 Large Residential1st Runner UpLaLiberte Iconic in Cave Creek, Arizona, is a 5,061-square-foot main house with a 760-square-foot guest casita built using Fox Blocks ICF. The project was the Large Residential 1st Runner Up in the 2024 ICF Builder Awards. ICF...
San Anselmo
2024 Large Residential2nd Runner Up Two homes next door to each other in San Anselmo California, were built using IntegraSpec ICFs. The larger of those homes, at 3,420 square feet, was the 2nd Runner Up in the 2024 ICF Builder Awards. The home is 100% ICF, including...
Mayura Manor
2023 Large ResidentialWinner Mayura Manor in Winter Park, Florida, is a custom home built using Fox Blocks by Airlite Plastics Co. Completed in June 2022, the home has 4,330 square feet of conditioned space along with a 280-square-foot swimming pool."The top priority...
Driftwood
2023 Large Residential1st Runner-Up & People's Choice This million-dollar, 5,000-square-foot home, named The Driftwood, was the first runner-up in the Large Residential category in the 2023 ICF Builder Awards. The home used 4,300 square feet of Nudura ICF for the...
Mike White Project
2023 Large Residential2nd Runner-Up The Mike White Project in Bowling Green, Kentucky is a 4,285-square-foot residence built by Doug Martens Construction using Nudura ICFs. It is the largest 1-story ICF home in the surrounding area. Martens estimates that using ICFs...
Green Casa Maryland
2022 Large ResidentialWinner This 5,200-sq.-ft. home in Maryland is a model home dedicated to showcasing sustainable building practices. The home certainly achieved that in a variety of ways, including having nearly no waste thrown away on site during the build. Green...
Shah Residence
2022 Large Residential1st Runner-Up The Shah Residence was built in Santa Rosa, California, an area that had been scoured by wildfires not long ago. IntegraSpec provided the blocks for this large residence of approximately 5,000 square feet. The home was completed in...
Endymion Guesthouse
2022 Large Residential2nd Runner-Up(People’s Choice Winner) The Endymion Guesthouse in Ontario, Canada, is a large guesthouse that is part of a country family estate that accommodates the owners’ visiting family, friends and guests, allowing numerous configurations of...
Unlimited Residential
The Ranch
2024 Unlimited Residential2nd Runner Up & People's Choice Winner Project Statistics Location: Southern Alberta, CanadaType: ResidenceSize: 7,421 sq. ft. ICF Use: 15,917 sq. ft. Cost: $3.5 millionTotal Construction: 2 yearsICF Installation Time: 67 daysConstruction...
Custom Beach House
2024 Unlimited ResidentialWinner Project Statistics Location: Melbourne Beach, FloridaType: ResidenceSize: 8,900 sq. ft. ICF Use: 14,353 sq. ft. Cost: $6.1 millionTotal Construction: 156 weeksICF Installation Time: 150 daysConstruction Team General Contractor: Kinley...
Claunch Residence
2024 Unlimited Residential1st Runner Up Orange Beach is a small city on Alabama's Gulf Coast. The city is vulnerable to severe weather, including hurricanes, so the owners of this 12,776-square-foot single-family home located just 300 yards off the water opted to...
Garnet Way
2023 Unlimited ResidentialWinner(People's Choice Winner) Amvic, now called Alleguard, was the ICF block of choice for this Penticton, British Columbia, Canada project named Garnet Way. This project won both the Unlimited Residential category and the People’s Choice...
Crowther Home
2023 Unlimited Residential2nd Runner-Up Project Statistics Location: Page, ArizonaType: ResidenceSize: 6,300 sq. ft.ICF Use: 5,019 sq. ft.Cost: $1,800,000Total Construction: 88 weeksICF Installation Time: 35 days Construction Team Owner: Crowther Contracting...
Woods Residence
2023 Unlimited Residential1st Runner-Up Project Statistics Location: Rising Fawn, GeorgiaType: ResidenceSize: 8,405 sq. ft.ICF Use: 17,454 sq. ft.Cost: $1,580,000Total Construction: 52 weeksICF Installation Time: 60 days Construction Team Owner: Bob and Nadine...
Te Toka
2022 Unlimited ResidentialWinner Once in a while, a home comes along that has a remarkable set of qualities and characteristics. Te Toka is one of those homes. From its stunning location to its equally appealing design, to the many "firsts" and remarkable achievements...
Pinnacle Peak
2022 Unlimited Residential2nd Runner-Up(People’s Choice Winner) Scottsdale, Arizona, is a part of the country with stunning mountain views, and this 8,500-square-foot custom home at the bottom of Pinnacle Peak takes full advantage of the scenery and site. Built using...
Spinieo Residence
2022 Unlimited Residential1st Runner-Up Project Statistics Location: Chalfont, PennsylvaniaType: ResidenceSize: 14,800 sq. ft. ICF Use: 24,000 sq. ft. Cost: $2.4 millionTotal Construction: 104 weeksICF Installation Time: 100 days Construction Team Owner/Developer:...
Light Commercial
Lake Clark Air Hangar & Terminal
2024 Light Commercial Winner & People's Choice Winner Alaska is a difficult environment for construction during the best of times. The Lake Clark Air Hangar & Terminal, in Anchorage, was completed in October 2021 after 68 weeks, accounting for significant...
Bell Block Building
2024 Light Commercial2nd Runner Up Project Statistics Location: Waterbury, VermontType: Medical offices, restaurant & brewerySize: 9,300 sq. ft. ICF Use: 10,200 sq. ft. Cost: $2 millionTotal Construction: 68 weeksICF Installation Time: 5 monthsConstruction Team...
The Lewis Building
2024 Light Commercial1st Runner Up Project Statistics Location: Newburyport, MassachusettsType: Retail & apartmentsSize: 10,239 sq. ft. ICF Use: 11,617 sq. ft. Cost: $3.5 millionTotal Construction: 60 weeksICF Installation Time: 143 daysConstruction Team...
MAC Federal Credit Union
2023 Light Commercial2nd Runner-Up(People's Choice Winner) The MAC Federal Credit Union in Wasilla, Alaska, is a prime example of how insulated concrete forms (ICFs) can be used to create a beautiful, energy-efficient, and resilient building. Completed in July 2021,...
Roten Insurance Office
2023 Light Commercial Winner The Roten & Co. Insurance Office in San Antonio, Texas, is a 4,020-square-foot office with a 1,630-square-foot mezzanine all constructed of Amvic ICFs. Stacking of the ICF took only six days out of a total construction time of 30...
Hudson Studios
2023 Light Commercial1st Runner-Up Project Statistics Location: Bellingham, WashingtonType: Commercial art spaces, 2 offices, cafeSize: 9,000 sq. ft.ICF Use: 14,684 sq. ft.Cost: $2,500,000Total Construction: 130 weeksICF Installation Time: 60 days Construction...
Delta Terra Campus
2022 Light CommercialWinner(People’s Choice Winner) Delta Terra Campus is a high-end gym in San Antonio, Texas. This project had some complexities, and also showed how much creative design work is possible with ICFs. The building is 2,170 square feet with a 640 square...
Future Xpress Car Wash
2022 Light Commercial2nd Runner-Up Project Statistics Location: Rohnert Park, CaliforniaType: Car washSize: 6,389 sq. ft. ICF Use: 19,827 sq. ft. Cost: $1 millionTotal Construction: 52 weeksICF Installation Time: 120 days Construction Team Owner/Developer: Future...
KOPI – Greenwood Medical Centre
2022 Light Commercial1st Runner-Up Project Statistics Location: Kingston, Ontario, CanadaType: Physical therapy centerSize: 18,340 sq. ft. ICF Use: 31,373 sq. ft. Cost: $4.2 millionTotal Construction: 44 weeksICF Installation Time: 60 days Construction...
Heavy Commercial
Canterbury Woods Performing Arts Center
2024 Heavy Commercial2nd Runner Up & People's Choice Winner The Canterbury Woods Performing Arts Center in Williamsville, New York, is a unique structure built in a curvilinear parabolic cylinder design. The building uses 8- and 10-inch ICF forms made by Nudura to...
Divi Little Bay Resort
2024 Heavy CommercialWinner Visitors to Saint Martin, an island in the Caribbean that is divided into two sides — one French and one Dutch — will get to enjoy a new $20 million hotel addition to the existing Divi Little Bay Resort on the Dutch side. This winning...
Newark Army Reserve Center
2024 Heavy Commercial1st Runner Up Project Statistics Location: Newark, DelawareType: Army reserve centerSize: 42,000 sq. ft. ICF Use: 30,000 sq. ft. Cost: $19.75 millionTotal Construction: 61 weeksICF Installation Time: 80 daysConstruction Team Owner/Developer: US...
Centre National de Cyclisme de Bromont
2023 Heavy Commercial1st Runner-Up The Centre National de Cyclisme de Bromont, or CNCB, is an eye-catching structure thanks to its elliptical shape and tall, curved walls. The name of this building translates from the French as a “national center for cycling,” based...
Mandan, Hidatsa & Arikara (MHA) Interpretive Center
2023 Heavy Commercial2nd Runner-Up(People's Choice Winner) The Mandan, Hidatsa & Arikara Interpretive Center in New Town, North Dakota, was built using 12-inch and 10-inch core Fox Blocks, and Corbel Ledge Fox Blocks. The project won the People’s Choice award in...
St. Philip the Apostle Catholic Church
2023 Heavy CommercialWinner Flower Mound, Texas, is the home of this 26,000-square-feet church, built using 41,000 square feet of Nudura ICFs. This project was the winner of the Heavy Commercial category of the 2023 ICF Builder Awards in part due to the intricate and...
St. Martin de Porres
2022 Heavy Commercial1st Runner-Up St. Martin de Porres is a Roman Catholic Church in Prosper, Texas, which is just about 30 miles north of Dallas. Cameron Ware, Nudura's sales representative and ICF trainer, submitted this project to ICF Builder's ICF Builder Awards,...
Maine Molecular Expansion
2022 Heavy CommercialWinner(People’s Choice Winner) The Maine Molecular Quality Controls Inc. (MMQCI) project in Saco, Maine, is a rare example of ICFs being used in a laboratory setting. The project added and renovated a lab and office space. It was completed in June...
St. Matthew Catholic Church
2022 Heavy Commercial2nd Runner-Up Project Statistics Location: Bellevue, NebraskaType: ChurchSize: 37,000 sq. ft. ICF Use: 22,700 sq. ft. Cost: $9 millionTotal Construction: 81 weeksICF Installation Time: 100 days Construction Team Owner/Developer: St....
Education
Ellis Elementary School
2024 Education1st Runner Up & People's Choice Winner Ellis Elementary School in Logan, Utah, was the 1st Runner Up in the Education category in 2024’s ICF Builder Awards. The school’s architect was Stephen Williams of Design West Architects. The school, built...
Aspire Trade High School
2024 Education2nd Runner Up Project Statistics Location: Huntersville, North CarolinaType: SchoolSize: 65,561 sq. ft. ICF Use: 28,728 sq. ft. Cost: $18.7 millionTotal Construction: 14 monthsICF Installation Time: 90 daysConstruction Team Owner/Developer: Aspire...
Rich Pond Elementary School
2024 EducationWinner It is becoming increasingly important for schools to offer spaces for staff and students that can withstand extreme weather events. Bowling Green, Kentucky, the site of Rich Pond Elementary School, has experienced destructive tornadoes in the...
Frisco ISD Panther Creek High School
2023 EducationWinner Frisco, Texas, just 40 miles north of Dallas, Is home to the Frisco Independent School District (ISD). Within that ISD is Panther Creek High School, a new school that was completed in June 2022 using Nudura ICFs. Based on ICF square footage of...
Dune Lakes Elementary School
2023 Education2nd Runner-Up Project Statistics Location: Santa Rosa Beach, FloridaType: Elementary schoolSize: 150,000 sq. ft.ICF Use: 68,000 sq. ft.Cost: $36,100,000Total Construction: 70 weeksICF Installation Time: 120 days Construction Team Owner: Walton County...
A. Gary Walsingham Academy
2023 Education1st Runner-Up(People's Choice Winner) The A. Gary Walsingham Academy in Panama City Beach, Florida, is built with Nudura ICFs. It is the first new school built in the area after Hurricane Michael's landfall with 160 mph winds, and it is the first ICF...
University of Louisville Belknap Residence Hall
2022 MultiFamilyWinner Work on phase one of the University of Louisville Belknap Residence Hall was documented by Dan Kubican, principal engineer of structural engineering firm Brown + Kubican PSC in Lexington, Kentucky. Completed in August 2021, this $35...
Georgetown & Liberty Hill Independent School Districts
2022 EducationWinner Everette Williams Elementary School Wolf Ranch Elementary School Santa Rita Elementary School Project Statistics Location: Georgetown & Liberty Hill, TexasType: EducationSize: 354,540 sq. ft. combinedICF Use: 253,975 sq. ft. combined Cost:...
Ashbury Hills Elementary
2022 Education2nd Runner-Up Project Statistics Location: Papillion, NebraskaType: EducationSize: 55,000 sq. ft.ICF Use: 29,559 sq. ft. Cost: $13,000,000Total Construction: 14 monthsICF Installation Time: 8 weeks with 6-man crew Construction Team Owner/Developer:...
Hospitality
Holiday Inn Express
2017 Hospitality Winner The new eight-story Holiday Inn Express in downtown Louisville, Ky., is a landmark project. Standing about 100 feet tall from footer to parapet, it's the tallest building in the area. But it's also a landmark for the ICF industry. The project...
Springhill Suites
2017 Hospitality — 1st Runner Up By now, the concept of using ICF for mid-rise hotel construction is well established. This five-story SpringHill Suites near Fort Worth, Texas, is one of at least eight mid-rise ICF hotels built in that metro area within the past few...
Holiday Inn Conference Center
2016 Multifamily Winner The Center Park Holiday Inn Conference Center is a 116,000-sq.-ft. hotel, event and conference center, with a full service wedding chapel, restaurant, and a number of other unique features integrated into the design. Built on the outskirts of...
Hilton Garden Inn Uniontown
2016 Multifamily 1st Runner-Up The Hilton Garden Inn completed last year in Uniontown, Penn., is a compelling example of ICF mid-rise construction. It's notable not only for innovative construction materials, but also for the value-engineering that went into the...
Wallhouse Hotel
20014 Multifamily 2nd Runner-Up Wallhouse Hotel is a 63-room European boutique-style hotel set in the rolling hills and woodlands of rural Ohio. At five stories high, it's the tallest building in Holmes County, Ohio and attracts considerable attention. Despite the...
Hilton Garden Inn Lewisville
The developer of this project, for example, originally intended it to be built with CMU, but architect Glenn Griggs convinced them to build with ICFs by guaranteeing that the finished wall assembly cost less than masonry block.Combined with the additional benefits of...
MultiFamily
Drury Plaza Hotel Lake Buena Vista
2024 MultiFamily2nd Runner Up & People's Choice Winner The Drury Plaza Hotel located in the Disney Springs Area in Lake Buena Vista, Florida, is the company’s largest hotel to date. This $100 million project is the first ICF building on Disney property, but it is...
Kentucky State University Residence Hall
2024 MultiFamily1st Runner Up Project Statistics Location: Frankfort, KentuckyType: Student housingSize: 163,400 sq. ft. ICF Use: 78,340 sq. ft. Cost: $37.6 millionTotal Construction: 106 weeksICF Installation Time: 220 daysConstruction Team Owner/Developer: CRM...
Homewood Suites & Hilton Garden Inn
2024 MultifamilyWinner The Homewood Suites and Hilton Garden Inn by Hilton is a dual-brand hotel in Columbus, Ohio, representing both Homewood Suites and Hilton Garden Inn by Hilton, and it is the MultiFamily first-place winner in the ICF Builder Awards. The...
Springhouse Village
2023 MultiFamily1st Runner-Up(People's Choice Winner) Project Statistics Location: Springfield, Missouri Type: Assisted living & memory care Size: 96,500 sq. ft. ICF Use: 55,260 sq. ft. Cost: $31,216,000 Total Construction: 73 weeks ICF Installation Time: 145...
University of Louisville Belknap Village South
2023 MultiFamilyWinner Project Statistics Location: Louisville, Kentucky Type: Collegiate residence hallSize: 130,000 sq. ft.ICF Use: 65,552 sq. ft.Cost: $38,500,000Total Construction: 75 weeksICF Installation Time: 90 days Construction Team Owner: University of...
Olâk
2023 MultiFamily2nd Runner-Up Project Statistics Location: Granby, Quebec, CanadaType: ApartmentsSize: 37,945 sq. ft.ICF Use: 40,473 sq. ft.Cost: $5,100,000Total Construction: 42 weeksICF Installation Time: 40 days Construction Team Owner: 9365-7872 Quebec Inc.,...
University of Louisville Belknap Residence Hall
2022 MultiFamilyWinner Work on phase one of the University of Louisville Belknap Residence Hall was documented by Dan Kubican, principal engineer of structural engineering firm Brown + Kubican PSC in Lexington, Kentucky. Completed in August 2021, this $35...
30 University Crescent
2022 MultiFamily1st Runner-Up(People’s Choice Winner) Donuts may have had something to do with ICF being selected for this MultiFamily 1st Runner Up Winner, jokes Andy Lennox, president of Logix Brands, the blocks chosen for this project. Of course, the donuts...
Orion at Lumino Park
2022 MultiFamily2nd Runner-Up Project Statistics Location: Calgary, Alberta, CanadaType: Multifamily affordable housingSize: 110,000 sq. ft. ICF Use: 50,000 sq. ft. Cost: $37,000,000Total Construction: 64 weeksICF Installation Time: 5 days per floor, 18 floors ...
MultiFamily Low-Rise
The Lighthouse
2024 MultiFamily Low-RiseWinner & People's Choice Winner Project Statistics Location: Parry Sound, Ontario, CanadaType: CondominiumSize: 20,70 sq. ft. ICF Use: 75,485 sq. ft. Cost: $15.4 millionTotal Construction: 105 weeksICF Installation Time: 165...
The Lanterns
2024 MultiFamily Low-Rise1st Runner Up Project Statistics Location: Hope Cove, EnglandType: Vacation rentalsSize: 14,800 sq. ft. ICF Use: 20,301 sq. ft. Cost: $2.2 millionTotal Construction: 108 weeksICF Installation Time: 225 daysConstruction Team Owner/Developer:...
Nelson Street Townhomes
2024 MultiFamily Low-Rise2nd Runner Up Project Statistics Location: Esquimalt, British Columbia, CanadaType: TownhomesSize: 4,800 sq. ft. ICF Use: 11,990 sq. ft. Cost: $2.4 million CADTotal Construction: 88 weeksICF Installation Time: 180 daysConstruction Team...
Zero Place
2023 MultiFamily-Low RiseWinner Zero Place in New Paltz, New York, is a mixed-use building consisting of retail, apartments, and amenities, built using Fox Blocks by Airlite Plastics Co. The nearly 63,000 square foot building was completed in March 2022 for a total...
The Tom
2023 MultiFamily Low-Rise1st Runner-Up The Tom in Huntsville, Ontario, Canada, is a condominium built using the Amvic Building System, now known as Alleguard. The project consists of three floors at just under 14,000 square feet per floor, plus a parking garage. The...
Chatham Mixed Use Business-Residence
2023 MultiFamily Low-Rise2nd Runner-Up(People's Choice Winner) The Chatham Building in Fairhope, Alabama, is a mixed-use building with businesses offices and a residence on the first floor and a residence on the second floor. Built using Fox Blocks ICFs, the building...
Two On 1st Terraced Townhomes
2022 MultiFamily Low-Rise2nd Runner-Up(People’s Choice Winner) Project Statistics Location: Scottsdale, ArizonaType: Duplex custom homesSize: 11,060 sq. ft. (5,530 sq. ft. per unit)ICF Use: 10,160 sq. ft. Total Construction: 18 monthsICF Installation Time: 90 days...
Boulder Farms Townhomes
2022 MultiFamily Low-RiseWinner These townhomes in Johnston, Rhode Island, outperform an identical wood prototype in energy consumption by 50%. That's just one of the benefits that the builders found by using ICFs on this $22 million project. The builders estimate...
State Renaissance Townhomes
2022 MultiFamily Low-Rise1st Runner-Up Project Statistics Location: Brooklyn, New YorkType: TownhomesSize: 37,727 sq. ft.ICF Use: 81,410 sq. ft. Cost: $15,970,000 Total Construction: 3 yearsICF Installation Time: 178 days for walls and floor Construction...
Religious
St. Philip the Apostle Catholic Church
2023 Heavy CommercialWinner Flower Mound, Texas, is the home of this 26,000-square-feet church, built using 41,000 square feet of Nudura ICFs. This project was the winner of the Heavy Commercial category of the 2023 ICF Builder Awards in part due to the intricate and...
St. Matthew Catholic Church
2022 Heavy Commercial2nd Runner-Up Project Statistics Location: Bellevue, NebraskaType: ChurchSize: 37,000 sq. ft. ICF Use: 22,700 sq. ft. Cost: $9 millionTotal Construction: 81 weeksICF Installation Time: 100 days Construction Team Owner/Developer: St....
St. Martin de Porres
2022 Heavy Commercial1st Runner-Up St. Martin de Porres is a Roman Catholic Church in Prosper, Texas, which is just about 30 miles north of Dallas. Cameron Ware, Nudura's sales representative and ICF trainer, submitted this project to ICF Builder's ICF Builder Awards,...
St. Juan Diego Catholic Church
Heavy Commercial-Religious Winner St. Juan Diego Catholic Church, in Chandler, Arizona, is the latest of more than a dozen major ICF projects undertaken by the Catholic Archdiocese of Phoenix. It's an exceptionally complex and ICF-intensive project. With just more...
Oak Hills Church
2018 Heavy Commercial Finalist The new Oak Hills Church in San Antonio, Texas, is a blend of contemporary and traditional Hill Country designs. Begun in August of 2015, the project consisted of a remodel of the existing 115,000-sq.-ft. facility and construction of a...
Whitewater Crossing Christian Church
2018 Heavy Commercial (Religious) 1st Runner-Up Project Statistics Location: Cleves, Ohio Type: Church/New Construction and Remodel Size: 57,000 new/95,000 total sq. ft. (floor) ICF Use: 38,500 sq. ft. Cost: $12.8 million Total Construction: 96 weeks ICF...
San Francisco de Asis Church
The San Francisco de Asis Church in Flagstaff, Arizona, is the latest ICF project completed for the Phoenix Archdiocese of the Catholic Church. With soaring ICF gables and an elegantly sloped bell tower, it is truly a landmark project for the region....
Christian Life Center
2016 LIGHT COMMERCIAL 1st RUNNER-UP CHRISTIAN LIFE CENTER The Christian Life Center in Dayton, Ohio needed a new worship facility. About a decade ago, the church began the move towards “one church in several locations," adding three additional locations with a goal of...
Our Lady Of Sorrows Catholic Church
2016 Light Commercial Winner ICF use is well-established in Arizona, and church construction played an early role in driving commercial market growth in the area, with more than a dozen ICF religious buildings completed in the region. So when the Society of St. Pius...
Specialty Applications
Fitz’s Fish Ponds
2023 Specialty Application2nd Runner-Up Project Statistics Location: Milford, New JerseyType: Koi facility & greenhouseSize: 3,600 sq. ft.ICF Use: 1,600 sq. ft.Cost: $250,000Total Construction: 33 weeksICF Installation Time: 231 days Construction Team Owner:...
The Condor Infinity Edge Pool
2023 Specialty Application Winner(People's Choice Winner) The Condor Infinity-Edge Pool in Springfield, Missouri, was built with Fox Blocks ICFs. The pool was created with a single concrete pour, an EcoFinish, and an integrated clear acrylic wall that allows colored...
Kayden’s Place
2023 Specialty Application1st Runner-Up Project Statistics Location: Winnipeg, Manitoba, CanadaType: Landscape with water feature, cave, retaining wallSize: 600 sq. ft.ICF Use: 1,200 sq. ft.Cost: $80,000Total Construction: 8 weeksICF Installation Time: 7 days ...
Shop Building & Garage
2022 Specialty Project1st Runner-Up Project Statistics Location: Clarkesville, GeorgiaType: Wood shop, storage, truck garageSize: 1,200 sq. ft. ICF Use: 1,320 sq. ft. Cost: $66,352 Total Construction: 24 weeks of weekendsICF Installation Time: 2 1/2 days ...
Landscape Retaining Wall
2022 Specialty Project2nd Runner-Up(People’s Choice Winner) Project Statistics Location: Clarkesville, GeorgiaType: Decorative retaining wall Size: 360 sq. ft. ICF Use: 360 sq. ft.Cost: $4,225Total Construction: 13 weekendsICF Installation Time: 1/2 day ...
Baydo Developments Parkade
2022 Specialty ProjectWinnerProject Statistics Location: Saskatoon, Saskatchewan, CanadaType: Below-ground parkadeSize: 45,000 sq. ft. ICF Use: 12,000 sq. ft.Total Construction: 36 weeks ICF Installation Time: 90 days Construction Team Owner/Developer: Baydo...
Janecek Pool and Spa
2021 Specialty ApplicationWinner Project Statistics Location: Princeton, TexasType: Pool and SpaSize: 1,800 sq. ft. Construction Team Owner: Thomas JanecekGeneral Contractor: Thomas JanecekICF Installer: Francisco RuizArchitect: Thomas JanecekEngineer: Jerry...
Peterson Pool
2021 Specialty Application2nd Runner-Up Swimming pools are an even more hot commodity for homeowners right now than usual, due in large part to the pandemic forcing families to stay at home for so long. Luckily for this Cape Girardeau, Missouri, family, their stunning...
Carroll Pool
2021 Specialty Application1st Runner-Up Project Statistics Location: Paris, KentuckyType: Swimming Pool Construction Team General Contractor: Steve Carroll, BuildBlock KYICF Installer: Steve Carroll, BuildBlock KYForm Distributor: Steve Carroll, BuildBlock KYICF...
Pools
Garnet Way Infinity Pool
2024 Pools Winner& People's Choice Winner Project Statistics Location: Penticton, British Columbia, CanadaType: PoolSize: 900 sq. ft. ICF Use: 900 sq. ft. Cost: $1 million Total Construction: 60 weeksICF Installation Time: 14 days Construction Team...
Bama Breeze
2024 Pools2nd Runner-Up Project Statistics Location: Dauphin Island, Alabama Type: Pool Size: 700 sq. ft. ICF Use: 700 sq. ft. Cost: $150,000 Total Construction: 8 weeks ICF Installation Time: 6 days Construction Team Owner/Developer: Sandmen Properties General...
Shaw Hollow Infinity Pool
2024 Pools1st Runner Up Project Statistics Location: Springfield, MissouriType: PoolSize: 1,000 sq. ft.ICF Use: 1,000 sq. ft.Cost: $270,000Total Construction: 15 weeksICF Installation Time: 5 days Construction Team Owner/Developer: Robert & Kathy ShawGeneral...
Hanninen Pool
2022 Pools2nd Runner-Up Project Statistics Location: Coldbrook, Nova Scotia, CanadaType: Residential poolSize: 648 sq. ft. ICF Use: 648 sq. ft.Cost: $70,000Total Construction: 12 weeksICF Installation Time: 3 days Construction Team Owner/Developer: Hanninen Home...
Bracebridge Pool
2022 Pools Winner(People’s Choice Winner)Project Statistics Location: Bracebridge, Ontario, CanadaType: Residential poolSize: 648 sq. ft. ICF Use: 972 sq. ft. Cost: $100,000Total Construction: 5 daysICF Installation Time: 9 weeks Construction Team General...
Drew Rice Pool
2022 Pools1st Runner-Up Project Statistics Location: Harrodsburg, KentuckyType: Residential poolSize: 576 sq. ft. pool floorICF Use: 1,150 sq. ft. Cost: $125,000Total Construction: 32 weeksICF Installation Time: 21 days Construction Team Owner/Developer: DR...
Janecek Pool and Spa
2021 Specialty ApplicationWinner Project Statistics Location: Princeton, TexasType: Pool and SpaSize: 1,800 sq. ft. Construction Team Owner: Thomas JanecekGeneral Contractor: Thomas JanecekICF Installer: Francisco RuizArchitect: Thomas JanecekEngineer: Jerry...
Peterson Pool
2021 Specialty Application2nd Runner-Up Swimming pools are an even more hot commodity for homeowners right now than usual, due in large part to the pandemic forcing families to stay at home for so long. Luckily for this Cape Girardeau, Missouri, family, their stunning...
Carroll Pool
2021 Specialty Application1st Runner-Up Project Statistics Location: Paris, KentuckyType: Swimming Pool Construction Team General Contractor: Steve Carroll, BuildBlock KYICF Installer: Steve Carroll, BuildBlock KYForm Distributor: Steve Carroll, BuildBlock KYICF...